Carl Haas
Carl Haas
Professor of Engineering, University of Waterloo
Dirección de correo verificada de uwaterloo.ca - Página principal
TítuloCitado porAño
A selective disassembly multi-objective optimization approach for adaptive reuse of building components
B Sanchez, C Rausch, C Haas, R Saari
Resources, Conservation and Recycling 154, 104605, 2020
2020
Infrastructure computer vision
I Brilakis, CTM Haas
Butterworth-Heinemann, 2019
22019
Impact of augmented reality and spatial cognition on assembly in construction
C Kwiatek, M Sharif, S Li, C Haas, S Walbridge
Automation in Construction 108, 102935, 2019
2019
Probabilistic Risk Management Framework for Tolerance-Related Issues in Modularized Projects: Local and Global Perspectives
MSA Enshassi, S Walbridge, JS West, CT Haas
ASCE-ASME Journal of Risk and Uncertainty in Engineering Systems, Part A …, 2019
2019
Dynamic and Proactive Risk-Based Methodology for Managing Excessive Geometric Variability Issues in Modular Construction Projects Using Bayesian Theory
MSA Enshassi, S Walbridge, JS West, CT Haas
Journal of Construction Engineering and Management 146 (2), 04019096, 2019
2019
Deconstruction programming for adaptive reuse of buildings
B Sanchez, C Rausch, C Haas
Automation in Construction 107, 102921, 2019
32019
Jerk as an indicator of physical exertion and fatigue
L Zhang, MM Diraneyya, JH Ryu, CT Haas, EM Abdel-Rahman
Automation in Construction 104, 120-128, 2019
42019
Monte Carlo simulation for tolerance analysis in prefabrication and offsite construction
C Rausch, M Nahangi, C Haas, W Liang
Automation in Construction 103, 300-314, 2019
22019
Selective Deconstruction Programming for Adaptive Reuse of Buildings
B Sanchez, C Rausch, C Haas
Computing in Civil Engineering 2019: Data, Sensing, and Analytics, 225-232, 2019
2019
A 3D Irregular Packing Algorithm Using Point Cloud Data
Y Zhao, CT Haas
Computing in Civil Engineering 2019: Data, Sensing, and Analytics, 201-208, 2019
2019
Spatial Parameterization of Non-Semantic CAD Elements for Supporting Automated Disassembly Planning
C Rausch, B Sanchez, C Haas
Modular and Offsite Construction (MOC) Summit Proceedings, 108-115, 2019
2019
Usage of Interface Management System in Adaptive Reuse of Buildings
E Eray, B Sanchez, C Haas
Buildings 9 (5), 105, 2019
22019
Integrated Risk Management Framework for Tolerance-Based Mitigation Strategy Decision Support in Modular Construction Projects
MSA Enshassi, S Walbridge, JS West, CT Haas
Journal of Management in Engineering 35 (4), 05019004, 2019
52019
Pipe radius estimation using Kinect range cameras
M Nahangi, T Czerniawski, CT Haas, S Walbridge
Automation in construction 99, 197-205, 2019
22019
Automated Monitoring of Physical Fatigue Using Jerk
L Zhang, MM Diraneyya, J Ryu, CT Haas, E Abdel-Rahman
ISARC. Proceedings of the International Symposium on Automation and Robotics …, 2019
2019
A methodology to analyze the net environmental impacts and building’s cost performance of an adaptive reuse project: a case study of the Waterloo County Courthouse renovations
B Sanchez, ME Esfahani, C Haas
Environment Systems and Decisions, 1-20, 2019
42019
Multi-objective Optimization Analysis for Selective Disassembly Planning of Buildings
B Sancheza, C Rauscha, C Haasa, R Saaria
ISARC. Proceedings of the International Symposium on Automation and Robotics …, 2019
2019
Using Scan-to-BIM Techniques to Find Optimal Modeling Effort; A Methodology for Adaptive Reuse Projects
ME Esfahania, E Eraya, S Chuoa, MM Sharifa, C Haasa
ISARC. Proceedings of the International Symposium on Automation and Robotics …, 2019
2019
Usage of Interface Management in Adaptive Reuse of Buildings
E Eray, B Sanchez, S Kang, C Haas
Advances in Informatics and Computing in Civil and Construction Engineering …, 2019
12019
Improving construction industry process interoperability with Industry Foundation Processes (IFP)
B Golzarpoor, CT Haas, D Rayside, S Kang, M Weston
Advanced Engineering Informatics 38, 555-568, 2018
32018
El sistema no puede realizar la operación en estos momentos. Inténtalo de nuevo más tarde.
Artículos 1–20