| Project cash flow analysis in the presence of uncertainty in activity duration and cost A Maravas, JP Pantouvakis International Journal of Project Management, 2011 | 98 | 2011 |
| Early Cost Estimating of Road Tunnel Construction Using Neural Networks K Petroutsatou, E Georgopoulos, S Lambropoulos, JP Pantouvakis Journal of Construction Engineering and Management 138 (6), 679-687, 2012 | 65 | 2012 |
| Evaluating Research Methodology in Construction Productivity Studies A Panas, JP Pantouvakis The Built & Human Environment Review 3 (1), 2011 | 53 | 2011 |
| Fuzzy repetitive scheduling method for projects with repeating activities A Maravas, JP Pantouvakis Journal of Construction Engineering and Management 137 (7), 561-564, 2010 | 30 | 2010 |
| Improving qualifications‐based selection by use of the fuzzy Delphi method OG Manoliadis, JP Pantouvakis, SE Christodoulou Construction Management and Economics 27 (4), 373-384, 2009 | 29 | 2009 |
| Road tunnel early cost estimates using multiple regression analysis C Petroutsatou, S Lambropoulos, JP Pantouvakis Operational Research 6 (3), 311-322, 2006 | 27 | 2006 |
| SEMANTIC: smart EarthMoving analysis and estimation of cost S Lambropoulos, N Manolopoulos, JP Pantouvakis Construction Management & Economics 14 (2), 79-92, 1996 | 18 | 1996 |
| A cost estimate method for bridge superstructures using regression analysis and bootstrap N Fragkakis, S Lambropoulos, JP Pantouvakis Organization, technology & management in construction: an international …, 2010 | 16 | 2010 |
| Simulation-Based and Statistical Analysis of the Learning Effect in Floating Caisson Construction Operations A Panas, JP Pantouvakis Journal of Construction Engineering and Management 140 (1), 2014 | 15 | 2014 |
| Computer simulation and analysis framework for floating caisson construction operations JP Pantouvakis, A Panas Automation in construction 36, 196-207, 2013 | 15 | 2013 |
| Modeling Uncertainty During Cost Benefit Analysis of Transportation Projects with the Aid of Fuzzy Set Theory A Maravas, JP Pantouvakis, S Lambropoulos Procedia-Social and Behavioral Sciences 48, 3661-3670, 2012 | 14 | 2012 |
| An effective disaster recovery model for construction projects LG Anthopoulosa, E Kostavarab, JP Pantouvakisc | 13 | 2012 |
| A compromise programming model for site selection of borrow pits JP Pantouvakis, OG Manoliadis Construction Management and Economics 26 (5), 433-446, 2008 | 10 | 2008 |
| A practical approach to resource-constrained project scheduling JP Pantouvakis, OG Manoliadis Operational Research 6 (3), 299-309, 2006 | 10 | 2006 |
| Reforming civil engineering studies in recession times S Lambropoulos, JP Pantouvakis, M Marinelli Procedia-Social and Behavioral Sciences 119, 776-785, 2014 | 9 | 2014 |
| Guidelines for modelling time and cost uncertainty in project and programme management A Maravas, JP Pantouvakis Procedia-Social and Behavioral Sciences 74, 203-211, 2013 | 8 | 2013 |
| Comparative analysis of operational coefficients' impact on excavation operations A Panas, JP Pantouvakis Engineering, Construction and Architectural Management 17 (5), 461-475, 2010 | 8 | 2010 |
| Using real options in evaluating PPP/PFI projects N Vandoros, JP Pantouvakis Symposium on sustainability and value through construction procurement, 594, 2006 | 7 | 2006 |
| Α computer-aided conceptual cost estimating system for prestressed concrete road bridges N Fragkakis, S Lambropoulos, JP Pantouvakis International Journal of Information Technology in Project Management, 13, 2013 | 6* | 2013 |
| A study of cash flows in projects with fuzzy activity durations A Maravas, JP Pantouvakis Proceedings of the International Conference on Computing in Civil and …, 2010 | 6 | 2010 |