TítuloCitado porAño
Project cash flow analysis in the presence of uncertainty in activity duration and cost
A Maravas, JP Pantouvakis
International Journal of Project Management, 2011
962011
Early Cost Estimating of Road Tunnel Construction Using Neural Networks
K Petroutsatou, E Georgopoulos, S Lambropoulos, JP Pantouvakis
Journal of Construction Engineering and Management 138 (6), 679-687, 2012
622012
Evaluating Research Methodology in Construction Productivity Studies
A Panas, JP Pantouvakis
The Built & Human Environment Review 3 (1), 2011
522011
Fuzzy repetitive scheduling method for projects with repeating activities
A Maravas, JP Pantouvakis
Journal of Construction Engineering and Management 137 (7), 561-564, 2010
302010
Improving qualifications‐based selection by use of the fuzzy Delphi method
OG Manoliadis, JP Pantouvakis, SE Christodoulou
Construction Management and Economics 27 (4), 373-384, 2009
282009
Road tunnel early cost estimates using multiple regression analysis
C Petroutsatou, S Lambropoulos, JP Pantouvakis
Operational Research 6 (3), 311-322, 2006
272006
SEMANTIC: smart EarthMoving analysis and estimation of cost
S Lambropoulos, N Manolopoulos, JP Pantouvakis
Construction Management & Economics 14 (2), 79-92, 1996
181996
A cost estimate method for bridge superstructures using regression analysis and bootstrap
N Fragkakis, S Lambropoulos, JP Pantouvakis
Organization, technology & management in construction: an international …, 2010
162010
Simulation-Based and Statistical Analysis of the Learning Effect in Floating Caisson Construction Operations
A Panas, JP Pantouvakis
Journal of Construction Engineering and Management 140 (1), 2014
142014
Computer simulation and analysis framework for floating caisson construction operations
JP Pantouvakis, A Panas
Automation in construction 36, 196-207, 2013
142013
Modeling Uncertainty During Cost Benefit Analysis of Transportation Projects with the Aid of Fuzzy Set Theory
A Maravas, JP Pantouvakis, S Lambropoulos
Procedia-Social and Behavioral Sciences 48, 3661-3670, 2012
132012
An effective disaster recovery model for construction projects
LG Anthopoulosa, E Kostavarab, JP Pantouvakisc
132012
A compromise programming model for site selection of borrow pits
JP Pantouvakis, OG Manoliadis
Construction Management and Economics 26 (5), 433-446, 2008
102008
A practical approach to resource-constrained project scheduling
JP Pantouvakis, OG Manoliadis
Operational Research 6 (3), 299-309, 2006
102006
Reforming civil engineering studies in recession times
S Lambropoulos, JP Pantouvakis, M Marinelli
Procedia-Social and Behavioral Sciences 119, 776-785, 2014
92014
Guidelines for modelling time and cost uncertainty in project and programme management
A Maravas, JP Pantouvakis
Procedia-Social and Behavioral Sciences 74, 203-211, 2013
82013
Comparative analysis of operational coefficients' impact on excavation operations
A Panas, JP Pantouvakis
Engineering, Construction and Architectural Management 17 (5), 461-475, 2010
82010
Using real options in evaluating PPP/PFI projects
N Vandoros, JP Pantouvakis
Symposium on sustainability and value through construction procurement, 594, 2006
72006
Α computer-aided conceptual cost estimating system for prestressed concrete road bridges
N Fragkakis, S Lambropoulos, JP Pantouvakis
International Journal of Information Technology in Project Management, 13, 2013
6*2013
A study of cash flows in projects with fuzzy activity durations
A Maravas, JP Pantouvakis
Proceedings of the International Conference on Computing in Civil and …, 2010
62010