| Proposal of a new reliability allocation methodology: the integrated factors method F De Felice, D Falcone, A Silvestri, G Di Bona International Journal of Operations and Quantitative Management 16 (1), 67-85, 2010 | 34 | 2010 |
| Integrated Factors Method (IFM): a new reliability allocation technique D Falcone, A Silvestri, G Di Bona system 374, 166, 2002 | 19 | 2002 |
| A-IFM reliability allocation model based on multicriteria approach G Di Bona, A Forcina, A Petrillo, F De Felice, A Silvestri International Journal of Quality & Reliability Management 33 (5), 676-698, 2016 | 18 | 2016 |
| Critical flow method: a new reliability allocation approach for a thermonuclear system G Di Bona, A Forcina, A Silvestri Quality and Reliability Engineering International 32 (5), 1677-1691, 2016 | 16 | 2016 |
| Validation and application of a reliability allocation technique (advanced integrated factors method) to an industrial system D Falcone, FD Felice, GD Bona, V Duraccio, A Forcina, A Silvestri Proceedings of the IASTED International Conference on Modelling …, 2014 | 15 | 2014 |
| RAMS Analysis in a sintering plant by the employment of a new Reliability Allocation Method D Falcone, F De Felice, G Di Bona, A Silvestri Modelling and simulation, 2004 | 14 | 2004 |
| Total efficient risk priority number (TERPN): A new method for risk assessment G Di Bona, A Silvestri, A Forcina, A Petrillo Journal of Risk Research 21 (11), 1384-1408, 2018 | 12 | 2018 |
| Technical and economic verification of the convenience in reengineering a production line using simulation techniques D Falcone, A Forcina, G Di Bona, V Duraccio, A Silvestri, C Cerbaso 25th European Modeling and Simulation Symposium, EMSS, 327-332, 2013 | 10 | 2013 |
| AHP‐IFM target: an innovative method to define reliability target in an aerospace prototype based on analytic hierarchy process G Di Bona, A Silvestri, A Forcina, D Falcone Quality and Reliability Engineering International 33 (8), 1731-1751, 2017 | 9 | 2017 |
| Validation and application of a safety allocation technique (integrated hazard method) to an aerospace prototype G Di Bona, V Duraccio, A Silvestri, A Forcina Proceedings of the IASTED international conference on modelling …, 2014 | 9 | 2014 |
| Study and modelling of very flexible lines through simulation D Falcone, A Silvestri, GP Di Bona, A Forcina, A Pacitto Proceedings of the 2010 Spring Simulation Multiconference, 62, 2010 | 7 | 2010 |
| Building excellence through the Agile Reengineering Performance Model (ARPM) A strategic business model for organizations A Petrillo, G Di Bona, A Forcina, A Silvestri Business Process Management Journal 24 (1), 128-157, 2018 | 6 | 2018 |
| Productive line reengineering through simulation techniques G Di Bona, V Duraccio, A Silvestri, A Forcina Proceedings of the IASTED International Conference on Modelling …, 2014 | 6 | 2014 |
| IFM target 2.0: an innovative method to define reliability target for prototype systems G Di Bona, D Falcone, A Silvestri, A Forcina The International Journal of Advanced Manufacturing Technology 95 (9-12 …, 2018 | 5 | 2018 |
| Analytic critical flow method (ACFM): a reliability allocation method based on analytic hierarchy process G Di Bona, A Forcina Journal of Failure Analysis and Prevention 17 (6), 1149-1163, 2017 | 5 | 2017 |
| Reliability target assessment based on Integrated Factors Method (IFM): a real case study of a sintering plant G Di Bona, A Silvestri, A Forcina, A Petrillo Journal of Failure Analysis and Prevention 16 (6), 1038-1051, 2016 | 5 | 2016 |
| Risk assessment in a cogeneration system: Validation of a new safety allocation technique D Falcone, F De Felice, G Di Bona, V Duraccio, A Silvestri Applied Simulation an Modelling, Palma de Mallorca, Spain, 2007 | 5 | 2007 |
| Integrated Hazards Method: a new safety allocation technique D Falcone, A Silvestri, G Di Bona, V Duraccio Modelling and simulation, Montreal (Canada) 30, 2007 | 5 | 2007 |
| Technical and economical analysis of the layout of a palletization plant through simulation techniques D Falcone, V Duraccio, A Silvestri, G Di Bona Summer Computer Simulation Conference, 387-391, 2005 | 5 | 2005 |
| Maintenance strategy design in a sintering plant based on a multicriteria approach GD Bona, A Forcina, D Falcone International Journal of Management and Decision Making 17 (1), 29-49, 2018 | 4 | 2018 |