| Benefit evaluation for off‐site production in construction N Blismas, C Pasquire, A Gibb Construction Management and Economics 24 (2), 121-130, 2006 | 253 | 2006 |
| Target value design: using collaboration and a lean approach to reduce construction cost D Zimina, G Ballard, C Pasquire Construction Management and Economics 30 (5), 383-398, 2012 | 187 | 2012 |
| Delivering sustainability through value management NZ Abidin, CL Pasquire Engineering, construction and architectural management, 2005 | 126 | 2005 |
| Constraints to the use of off-site production on construction projects NG Blismas, M Pendlebury, A Gibb, C Pasquire Architectural engineering and design management 1 (3), 153-162, 2005 | 122 | 2005 |
| Revolutionize value management: A mode towards sustainability NZ Abidin, CL Pasquire International Journal of Project Management 25 (3), 275-282, 2007 | 98 | 2007 |
| Drivers for dynamic brief development in construction AAE Othman, TM Hassan, CL Pasquire Engineering, Construction and Architectural Management 11 (4), 248-258, 2004 | 82 | 2004 |
| Considerations for assessing the benefits of standardisation and pre-assembly in construction CL Pasquire, AGF Gibb © Emerald, 2002 | 70 | 2002 |
| Leaner construction through off-site manufacturing CL Pasquire, GE Connolly Proceedings IGLC, Gramado, Brazil, 263-266, 2002 | 69 | 2002 |
| Value theory in lean construction J Salvatierra-Garrido, C Pasquire Journal of Financial Management of Property and construction 16 (1), 8-18, 2011 | 63 | 2011 |
| Analysis of factors that drive brief development in construction AAE Othman, TM Hassan, CL Pasquire Engineering, Construction and Architectural Management 12 (1), 69-87, 2005 | 53 | 2005 |
| Labour productivity model for reinforced concrete construction projects H Jang, K Kim, J Kim, J Kim Construction Innovation 11 (1), 92-113, 2011 | 43 | 2011 |
| Target costing and designing to targets in construction A Pennanen, G Ballard, Y Haahtela Journal of Financial Management of Property and Construction 16 (1), 52-63, 2011 | 36 | 2011 |
| What should you really measure if you want to compare prefabrication with traditional construction C Pasquire, A Gibb, N Blismas Proceedings IGLC 13, 481-491, 2005 | 34 | 2005 |
| Language policy and local planning in South America: New directions for enrichment bilingual education in the Andes K King International Journal of Bilingual Education and Bilingualism 7 (5), 334-347, 2004 | 34 | 2004 |
| Exploring value concept through the iglc community: Nineteen years of experience J Salvatierra-Garrido, C Pasquire, L Miron Proc. 20th Ann. Conf. of the Int’l. Group for Lean Construction, 18-20, 2012 | 29 | 2012 |
| The importance and allocation of risks in Indonesian construction projects Andi Construction Management and Economics 24 (1), 69-80, 2006 | 29 | 2006 |
| APPENDIX A Lean Project Delivery–innovation in integrated design & delivery A Mossman, G Ballard, C Pasquire The Design Manager’s Handbook, 164, 2013 | 28 | 2013 |
| The 8th flow-common understanding CL Pasquire Nottingham Trent University, 2012 | 28 | 2012 |
| Motivation and incentives in relational contracts JW Darrington, GA Howell Journal of Financial Management of Property and Construction 16 (1), 42-51, 2011 | 28 | 2011 |
| Safety as an emergent property of the production system: How lean practices reduce the likelihood of accidents P Mitropoulos, G Cupido, M Namboodiri 17th Annual Conference of the International Group for Lean Construction …, 2007 | 28 | 2007 |