| Microstructural analysis of recycled aggregate concrete produced from two-stage mixing approach VWY Tam, XF Gao, CM Tam Cement and concrete research 35 (6), 1195-1203, 2005 | 578 | 2005 |
| A biodegradable polymer-based coating to control the performance of magnesium alloy orthopaedic implants HM Wong, KWK Yeung, KO Lam, V Tam, PK Chu, KDK Luk, KMC Cheung Biomaterials 31 (8), 2084-2096, 2010 | 469 | 2010 |
| Implementation of environmental management in the Hong Kong construction industry LY Shen, VWY Tam International Journal of Project Management 20 (7), 535-543, 2002 | 396 | 2002 |
| Towards adoption of prefabrication in construction VWY Tam, CM Tam, SX Zeng, WCY Ng Building and environment 42 (10), 3642-3654, 2007 | 377 | 2007 |
| A review on the viable technology for construction waste recycling VWY Tam, CM Tam Resources, conservation and recycling 47 (3), 209-221, 2006 | 336 | 2006 |
| Project feasibility study: the key to successful implementation of sustainable and socially responsible construction management practice L Shen, VWY Tam, L Tam, Y Ji Journal of Cleaner Production 18 (3), 254-259, 2010 | 295 | 2010 |
| Removal of cement mortar remains from recycled aggregate using pre-soaking approaches VWY Tam, CM Tam, KN Le Resources, Conservation and Recycling 50 (1), 82-101, 2007 | 263 | 2007 |
| Towards implementation of ISO 14001 environmental management systems in selected industries in China SX Zeng, CM Tam, VWY Tam, ZM Deng Journal of Cleaner Production 13 (7), 645-656, 2005 | 233 | 2005 |
| Mapping approach for examining waste management on construction sites LY Shen, VWY Tam, CM Tam, D Drew Journal of construction engineering and management 130 (4), 472-481, 2004 | 231 | 2004 |
| On the effectiveness in implementing a waste-management-plan method in construction VWY Tam Waste management 28 (6), 1072-1080, 2008 | 215 | 2008 |
| Comparing the implementation of concrete recycling in the Australian and Japanese construction industries VWY Tam Journal of Cleaner production 17 (7), 688-702, 2009 | 207 | 2009 |
| A checklist for assessing sustainability performance of construction projects LY Shen, J Li Hao, VWY Tam, H Yao Journal of civil engineering and management 13 (4), 273-281, 2007 | 191 | 2007 |
| National culture and safe work behaviour of construction workers in Pakistan S Mohamed, TH Ali, WYV Tam Safety science 47 (1), 29-35, 2009 | 190 | 2009 |
| EKC analysis for studying economic growth and environmental quality: a case study in China XD Diao, SX Zeng, CM Tam, VWY Tam Journal of Cleaner Production 17 (5), 541-548, 2009 | 185 | 2009 |
| Economic comparison of concrete recycling: A case study approach VWY Tam Resources, conservation and recycling 52 (5), 821-828, 2008 | 173 | 2008 |
| Optimization on proportion for recycled aggregate in concrete using two-stage mixing approach VWY Tam, CM Tam, Y Wang Construction and Building Materials 21 (10), 1928-1939, 2007 | 173 | 2007 |
| Developing a risk assessment model for construction safety IWH Fung, VWY Tam, TY Lo, LLH Lu International Journal of Project Management 28 (6), 593-600, 2010 | 162 | 2010 |
| Green construction assessment for environmental management in the construction industry of Hong Kong CM Tam, VWY Tam, WS Tsui International Journal of Project Management 22 (7), 563-571, 2004 | 162 | 2004 |
| Evaluations of existing waste recycling methods: a Hong Kong study VWY Tam, CM Tam Building and Environment 41 (12), 1649-1660, 2006 | 160 | 2006 |
| Towards occupational health and safety systems in the construction industry of China SX Zeng, VWY Tam, CM Tam Safety science 46 (8), 1155-1168, 2008 | 156 | 2008 |